Autor
|
Titel
|
Jahr
|
Band Seite
|
|
|
|
|
|
|
Endre E., Fergus T., Moholt R. |
CLASSIFICATION OF QUICK CLAYZONES TO PINPOINTAREAS OF HIGH RISK - RESULTS AND EXPERIENCES |
2004 |
2 IV/127 - IV/136 |
|
Meißl G., Geitner C., Stötter J. |
CLASSIFICATION OF SMALL ALPINE CATCHMENTS - A TOOL TO SUPPORT THE CHOICE OF RAINFALL-RUNOFF-MODELS [Extended Abstract] |
2008 |
EA 290 - 291 |
|
Paul Dobesberger, Andreas Koler, Stefan Ortner, Brigitte Eder, Angela Michiko Hama, Marcel Innerkofler, Oskar Januschke and Martin Preßlaber |
Climate sensitive risk management - a best practice example by the city of Lienz, Tyrol, Austria |
2016 |
EA 198 - 199
|
|
Andrea Salvetti |
Climatic and morphologic controls on debris flow initiation and magnitude in Southern Switzerland. |
2016 |
EA 248 - 249
|
|
Tropeano D., Turconi L., Sanna S. |
CLOUDBURST IN VAL CANALE, EASTERN ITALIAN ALPS |
2004 |
1 I/121 - I/132 |
|
MATSUMURA K., MASIKO K., TAKAHAMA J. |
Collapse and debrisflow in windfall tree area. |
1996 |
3 227 - 236 |
|
Jean-Matthieu Monnet, Franck Bourrier, Céline Vargel, Jérôme Lopez-Saez, Christophe Corona, Frédéric Berger and Dominique Laigle |
Combined use of rockfall trajectory simulations and tree impacts observations for rockfall frequency assessment |
2016 |
EA 226 - 227
|
|
Bell R., Röhrs M. , Glade T., Dix A. |
COMBINING HISTORIC INFORMATION AND HIGH RESOLUTION DTMS TO IMPROVE THE UNDERSTANDING OF TODAY'S MAXIMUM POSSIBLE LANDSLIDE EVENTS AND ITS RELEVANCE FOR HAZARD ASSESSMENT [Extended Abstract] |
2008 |
EA 34 - 35 |
|
Kaitna R., Rickenmann D., Schatzmann M. |
COMPARATIVE RHEOLOGIC INVESTIGATIONS OF DEBRIS FLOW MATERIAL [Extended Abstract] |
2008 |
EA 208 - 209 |
|
Luuk Dorren and Roderick Kühne |
Comparing the 3D rockfall simulation models Rockyfor3D and RAMMS::ROCKFALL at a case study site in Switzerland |
2016 |
EA 82 - 83
|
|
Huber A. |
COMPARISON OF 2-D DEBRIS FLOW SIMULATION MODELS - IMPLICATIONS FOR PRACTICAL MODEL APPLICATION TO HAZARD ASSESSMENT FOR ALPINE TRANSPORT INFRASTRUCTURE |
2012 |
EA 176 - 177 |
|
Ting-Chi TSAO, Chuan-Yi HUANG, Jung-Hsing CHIEN, Hsiao-Yuan YIN and Chen-Yu CHEN |
Comparison of Debris Flow Hazard Mapping between Empirical Function and Numerical Simulation - A Case Study in Taiwan - |
2018 |
EA 80 - 81 |
|
Ting-Chi TSAO, Chuan-Yi HUANG, Jung-Hsing CHIEN, Hsiao-Yuan YIN and Chen-Yu CHEN |
Comparison of Debris Flow Hazard Mapping between Empirical Function and Numerical Simulation - a Case Study in Taiwan - |
2018 |
1 349 - 354
|
|
Jörg P., Granig M., Bühler Y. and Schreiber H. |
COMPARISON OF MEASURED AND SIMULATED - SNOW AVALANCHE VELOCITIES |
2012 |
1 169 - 178 |
|
Stangl R., Siedschlag A., Silvestru D., Fritz F. and Jerkovic A. |
COMPREHENSIVE SECURITY RESEARCH TO CONTRIBUTE TO CRITICAL INFRASTRUCTURE PROTECTION - A CONTRIBUTION TO SECURITY GOVERNANCE IN DISASTER RISK REDUCTION |
2012 |
EA 362 - 363 |
|
Stangl R., Siedschlag A., Silvestru D., Fritz F. and Jerkovic A. |
COMPREHENSIVE SECURITY RESEARCH TO CONTRIBUTE TO CRITICAL INFRASTRUCTURE PROTECTION - CONTRIBUTIONS TO SECURITY GOVERNANCE IN DISASTER RISK REDUCTION |
2012 |
1 585 - 596 |
|
Toshiyasu UENO, Hiroyuki TANIGUCHI, Kazuya ABE |
Comprehensive sediment related disaster prevention countermeasures in Kagoshima prefecture |
2014 |
EA 224 - 225 |
|
Toshiyasu UENO, Hiroyuki TANIGUCHI, Kazuya ABE |
Comprehensive Sediment Related Disaster Prevention Countermeasures in Kagoshima Prefecture |
2014 |
1 719 - 726 |
|
Takashi TAMURA, Masayuki FUJITA, Kiyoto IKEMIZU and Shusaku KAKOI |
Comprehensive Sediment-related Disaster Prevention Countermeasures in Kagoshima Prefecture |
2018 |
EA 148 - 149 |
|
Yoshinori SHINOHARA, Haruka TSUNETAKA, Gaku KITAMOTO, Norifumi HOTTA, Hisanobu MITSUTAKE and Toshiyasu UENO |
Conditions for Developing Debris Flows at Mt. Unzen |
2018 |
EA 98 - 99 |
|
GARCZYNSKI E. |
Connaissances Actuelles et Projet d'Etude sur les Influences Hydrologiques et Climatologiques de la Foret a Partir de Données Françaises et Etrangères. [Neue Erkenntnisse über die hydrologischen und klimatischen Auswirkungen des Waldes aus Studienprojekten in Frankreich und im Ausland.] |
1980 |
4 223 - 229 |
|
Giulia Bossi, Stefano Crema, Marco Cavalli, Gianluca Marcato and Alessandro Pasuto |
Connectivity patterns as an informative layer to investigate geomorphological processes: the Ganderberg landslide case study (Eastern Italian Alps) |
2016 |
EA 188 - 189
|
|
Horvat A. |
Consequences and Response to the Disaster, Konsequenzen und Katastrophenmanagement |
2004 |
4 IX/77 - IX/87 |
|
Mair V., Zischg A. and Lang K. |
CONSIDERATION OF PERMAFROST AND PERMAFROST DEGRADATION IN NATURAL HAZARDS AND RISK ASSESSMENT |
2012 |
EA 250 - 251 |
|
Zischg A., Mair V., Lang K., Deline P., Ravanel L., Schoeneich P. and Kellerer-Pirklbauer A., |
CONSIDERATION OF PERMAFROST AND PERMAFROST DEGRADATION IN NATURAL HAZARDS ASSESSMENT |
2012 |
1 237 - 245 |
|
Margreth S., Romang H. |
CONSIDERATION OF THE EFFECT OF PROTECTION MEASURES IN HAZARD MAPS: THE SWISS APPROACH [Extended Abstract] |
2008 |
EA 282 - 283 |
|
Ortner S. and Joebstl C. |
CONSIDERATION OF THE NATIONAL FLOOD AWARENESS AND HANDLING IN A TRANSNATIONAL CONTEXT - THE AUSTRIAN / GERMAN / ITALIAN / SPAIN APPROACH BY COMPARISON |
2012 |
EA 288 - 289 |
|
Tetsuya KUBOTA, Gou NAKAMURA and Yoshinori SHINOHARA |
Consideration to the Early Warning Rainfall Criteria of Landslides after Strong Earthquake in Japan |
2014 |
EA 190 - 191 |
|
Tetsuya KUBOTA, Gou NAKAMURA, Yoshinori SHINOHARA |
Consideration to the Early Warning Rainfall Criteria of Landslides after Strong Earthquakes in Japan |
2014 |
1 585 - 590 |
|
Zeidler A. and Dobesberger P. |
CONSIDERING CLIMATE CHANGE IN NATURAL HAZARD RISK MANAGEMENT IN ENERGY SYSTEMS - A PRACTICAL APPRAOCH |
2012 |
EA 426 - 427 |
|
Yu LUO and Si-ming HE |
Considering the Quantitative Effect of Antecedent Rainfall on Slope Stability to Predicting Rainfall-induced Shallow Landslides at the Basin Scale |
2018 |
EA 64 - 65 |
|
Yu LUO and Si-ming HE |
Considering the Quantitative Effect of Antecedent Rainfall on Slope Stability to Predicting Rainfall-induced Shallow Landslides at the Basin Scale |
2018 |
1 61 - 68
|
|
Horii N., Toyosawa Y., Tamate S., Hamajima K. |
Construction of a support system for optimum arrangement of debris flow detection sensors |
2002 |
1 475 - 482 |
|
Witczak E., Fergus T. |
CONSTRUCTION WORKS AND THEIR TECHNICAL-ECONOMIC EXPEDIENCE RIVER SAFETY MEASURES IN QUICK CLAY AREAS |
2004 |
4 VIII/303 - VIII/310 |
|
Pre_eren T., Steinman F. and Pape_ J. |
CONTINGENCY PLANNING ORIENTED HAZARD MAPPING - LESSONS LEARNED WITHIN THE MONITOR II PROJECT - SLOVENIAN EXAMPLE |
2012 |
EA 310 - 311 |
|
Prešeren T., Steinman F. and Papež J. |
CONTINGENCY PLANNING ORIENTED HAZARD MAPS - NEW IDEAS AND LESSONS LEARNED WITHIN THE MONITOR II PROJECT - SLOVENIAN EXAMPLE |
2012 |
2 917 - 928 |
|
Daniel Trappmann, Markus Stoffel and Luuk Dorren |
Contribution of tree-impact data and tree-ring analyses to rockfall risk assessments: a case study from the Swiss Alps |
2016 |
EA 272 - 273
|
|
WEINMEISTER W. |
Contribution towards sustainable protection against natural hazards. (Beiträge für einen nachhaltigen Schutz vor Naturgefahren) |
2000 |
1 85 - 96 |
|
Norio HARADA and Yoshifumi SATOFUKA |
Control of Debris Flow Using Steel-grid SABO Dams |
2014 |
EA 178 - 179 |
|
Norio HARADA, Yoshifumi SATOFUKA |
Control of Debris Flow Using Steel-grid SABO Dams |
2014 |
1 535 - 543 |
|
Arthur Vogl, Mathias H. Luxner and Hubert Agerer |
Controlled and efficient bed load management by means of variable drain locks embedded in a crownclosed large drain sediment control dam |
2016 |
1 853 - 861
|
|
Yuki NISHIGUCHI, Taro UCHIDA, Yoshifumi SATOFUKA, Kana NAKATANI and Takahisa MIZUYAMA |
Controlling Factors of Phase-shift of Fine Sediment in Large-scale Debris Flows |
2014 |
EA 204 - 205 |
|
Yuki NISHIGUCHI, Taro UCHIDA, Yoshifumi SATOFUKA, Kana NAKATANI, Takahisa MIZUYAMA |
Controlling Factors of Phase-shift of Fine Sediment in Large-scale Debris flows |
2014 |
1 640 - 647 |
|
Juerg Karl Elsener, Jijun Xu, Christian Willi and Rao Fu |
Cooperation of China and Switzerland: water resources and risk management under changing climate |
2016 |
EA 202 - 203
|
|
Bell R., Danscheid M., Glade T., Pohl J. |
COOPERATIVE LANDSLIDE RISK MANAGEMENT - A NEW CONCEPT? [Extended Abstract] |
2008 |
EA 32 - 33 |
|
DRAGOGNA G. |
Coordinamenti Tecnici e Direttivi nella Difesa del Suolo.[Technische Koordination und Richtlinien für den Bodenschutz.] |
1980 |
4 69 - 71 |
|
LUYET G. |
Correction globale des cours d`eau de la commune de Grimisuat (Suisse). [Allgemeine Korrektur der Wasserläufe in der Gemeinde Grimisuat (Schweiz).] |
1992 |
5 79 - 91 |
|
Barbolini M., Pagliardi M. |
COSTS-BENEFIT ANALYSIS APPLIED TO MANAGMENT OF APPLICATION TO A CASE STUDY FROM BREMBANA VALLEY |
2004 |
2 VI/13 - VI/24 |
|
Aleyda MONTOYA, Alonso ALFARO, M?nica GUTI?RREZ, Jaime JUçREZ and Mikihiro MORI |
Countermeasure for Landslide Along the Pan-American Highway in the Metropolitan Area of El Salvador -Countermeasures for Problem Soils of Paleosol Overlaying Erodible Glassy Pyroclastic Flows which Occurred in the Fifth-Sixth Centuries- |
2018 |
EA 222 - 223 |
|
Wataru SAKURAI and Ryo SAKAI |
Countermeasures for large-scale landslide dams caused by Typhoon No. 12 in September 2011 |
2014 |
EA 142 - 143 |
|